Hebei Zhangbei Xishungou Wind Farm Project
#147of 1935 in Renewable energy#45of 1084 in China#91of 1459 in CDM (UNFCCC)#107of 1287 in ACM0002
Audit Analysis
A standard CDM wind project (ACM0002) with VVB-confirmed additionality and an appropriate jurisdictional grid-emission-factor baseline. The project is free of reversal risk and leakage concerns typical of grid-connected wind, but several verification data points (verified ERR, FNRB, usage monitoring) are absent from the extracted record, and four inter-document contradictions—though largely explainable—warrant caution.
Red Flags
- Baseline method is characterised as 'project' in the 2021 monitoring report but 'jurisdictional' in the 2011 validation report; the jurisdictional reading is consistent with ACM0002 and is privileged, but the discrepancy reduces confidence in data consistency.
- Total ERR claimed differs between the 2015 monitoring report (301,760) and the 2021 monitoring report (362,234); while likely reflecting different reporting periods, the absence of a verified ERR figure prevents independent reconciliation.
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 61,373 | 0 | 61,373 | |
| 2015 | 301,760 | 0 | 301,760 | |
| 2022 | 362,234 | 0 | 362,234 | |
| Total | 725,367 | 0 | 725,367 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deduction, quantified justification
Jurisdictional EF, method contradiction across docs
Safeguards mentioned, FPIC/grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →