Audit Analysis
A CDM coal mine methane utilisation project with VVB-confirmed additionality via an investment test, but significant data gaps including no monitoring reports, a 10-fold discrepancy in claimed ERR between the PDD and validation report, and contradictory statements on whether methane capture is legally mandated. The project's integrity is moderate: the baseline is project-specific and modeled, leakage is set at 0% (reasonable for CMM but inconsistently justified), and no permanence buffer is in place.
Red Flags
- 10-fold discrepancy in total claimed ERR: the PDD states 1,749,250 tCO2 while the validation report states 174,925 tCO2 — a factor-of-ten difference that undermines confidence in the credit volume
- Contradiction on legal requirement of methane capture: the PDD asserts capture is legally required (which would negate additionality), while the validation report states it is not — the VVB's position is privileged but the inconsistency is unresolved
- No monitoring reports or verified ERR figures are available in the extracted record, making it impossible to assess actual delivery against the claimed baseline
- Leakage justification is inconsistent: the PDD describes it as 'deemed negligible' while the validation report states it was 'quantified' to zero
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but legal-requirement contradiction unresolved
Gas consumed on-site; no reversal risk identified
0% deduction reasonable for CMM but justification inconsiste
Project-specific modeled baseline; no reassessment data
Safeguards mentioned and benefit sharing described; no FPIC
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →