Hedcor Irisan 3.8MW Hydroelectric Power Project
#1381of 1935 in Renewable energy#11of 19 in Philippines#1115of 1459 in CDM (UNFCCC)#447of 806 in AMS-I.D
Audit Analysis
A 3.8 MW small hydro project in the Philippines validated under CDM AMS-I.D. with a VVB-confirmed barrier additionality test and FPIC, but the validation report contains 22 material findings including an emission-factor calculation error, outdated grid data (2002–2004), and a missing host-country Letter of Acceptance. No monitoring-period data, verified ERR, or buffer-pool information is available in the extracted record, and the overall extraction confidence is low, limiting the depth of assessment.
Red Flags
- The validation report lists 22 material findings, including an error in the grid emission-factor calculation (heat-rating value used instead of mass of fuel consumed) and the use of 2002–2004 data vintages that were not the latest available at the time of PDD submission.
- The host-country Letter of Acceptance had not been received at the time of validation, and the methodology version cited in the PDD (16.0) was flagged as not applicable for submission.
- No monitoring-period data, verified ERR, or post-validation performance information is present in the extracted record, making it impossible to confirm actual delivery against the claimed 5,312 tCO₂e/yr.
- The grid emission factor of 0.467 tCO₂/MWh is based on 2010 data, and the underlying fuel-consumption data vintages (2002–2004) are significantly outdated relative to the 2013 validation date.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but barriers heavily questioned
Avoidance project, no reversal risk
Deemed negligible, reasonable for hydro
Grid EF from 2010, data vintage concerns
FPIC done, grievance mechanism not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →