VCSEnergy industries (renewable/non-renewable sources)China Registry: RegisteredACM0002

Heilongjiang Bianfushan Wind Power Project

VCS-1049 ↗

#995of 1935 in Renewable energy#543of 1084 in China#637of 1339 in Verra (VCS)#785of 1287 in ACM0002

5.1/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.0
Documentation
4.5

Audit Analysis

A registered VCS wind power project (ACM0002) with VVB-confirmed investment additionality and inherent permanence advantages as an avoidance project. However, the project carries notable concerns: a 0% leakage deduction with no justification in the latest verification report, a grid emission factor frozen at 2009 values, a corrective action questioning additionality in light of over-delivery (~218% of pro-rata expectation), and seven data contradictions across documents. The low extraction confidence and multiple inconsistencies temper confidence in the overall data quality.

Red Flags

  • Leakage deduction of 0% with justification listed as 'not addressed' in the 2022 verification report, despite the 2013 report having stated it was 'deemed negligible' — the justification has effectively regressed
  • Corrective action requires the project to supplement the impact of higher-than-expected emission reductions on additionality, indicating the VVB found the original additionality analysis incomplete
  • Grid emission factor of 1.028 tCO2/MWh is from 2009, over 13 years old at the time of the 2022 verification, raising questions about baseline accuracy
  • Verified emissions reductions (133,950 tCO2) are approximately 218% of the pro-rata expectation for the monitoring period, suggesting the baseline may have been overly conservative or the PDD estimate was inaccurate
  • Seven contradictions identified across documents, including conflicting baseline method descriptions (project vs. jurisdictional) and inconsistent crediting period dates

Credit Vintages Exhausted

IssuedRetiredAvailable
2009
3143140
2010
107,933107,9330
2011
110,366110,3660
Total218,613218,6130

Risk Indicators

Additionality

VVB-confirmed but corrective action outstanding on over-deli

Permanence

Avoidance project — no reversal risk inherent to wind power

Leakage

0% deduction with justification regressed to 'not addressed'

Baseline

Project-specific baseline; grid EF frozen at 2009; method co

Safeguards

Safeguards mentioned in 2022 report but no FPIC, no grievanc

Double-claim

CORSIA not eligible; CCP status not stated but no dual-regis

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents