Heilongjiang Chemical N2O Abatement Project
#5of 189 in Methane#46of 1084 in China#92of 1459 in CDM (UNFCCC)
Audit Analysis
A CDM N2O abatement project at a Chinese chemical plant with a VVB-confirmed combined additionality test and a measured project-specific baseline. The project over-delivers relative to its pro-rata credit expectation, and no reversal or leakage concerns are identified. Key gaps include unstated safeguards details (FPIC, grievance mechanism) and a contradiction in the claimed ERR figures across monitoring reports.
Red Flags
- Contradiction in total claimed ERR: 138,234 (Aug 2012 report) vs 324,035 (Dec 2011 report) — a 2.3× discrepancy that undermines confidence in the baseline credit estimate
- Leakage justification shifts from 'deemed negligible' (Dec 2011) to 'quantified' (Feb 2013) within the same document type, suggesting the rationale was not firmly established at validation
- Sector classification in the registry record lists 'methane' for an N2O abatement project, indicating a possible data-entry or classification error in the registry
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 67,044 | 0 | 67,044 | |
| 2013 | 464,372 | 0 | 464,372 | |
| Total | 531,416 | 0 | 531,416 |
Risk Indicators
VVB-confirmed combined test
N2O destruction, no reversal risk
0% with quantified justification
Project-specific, measured
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.