Skip to main content
CDMWindChinaACM0002

Heilongjiang Dadingzi Wind Power Project

CDM-8568 ↗

#380of 1935 in Renewable energy#150of 1084 in China#247of 1459 in CDM (UNFCCC)#285of 1287 in ACM0002

6.0/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
6.0
Documentation
6.0

Audit Analysis

A CDM wind power project in China with a VVB-confirmed combined additionality test and a standard grid-emission-factor baseline. The project is inherently low-risk for permanence and leakage, but several contradictions between the validation and monitoring reports, five material findings requiring corrective action, and the absence of a verified ERR figure limit confidence in the overall credit quality.

Red Flags

  • Total verified ERR is not stated in any available document, preventing confirmation that claimed credits were actually delivered
  • Five material findings in the validation report (including a pending DNA approval letter and an income-tax calculation error) required corrective action before registration
  • Leakage justification is contradictory: the validation report (2012) deems it negligible while the monitoring report (2022) records it as not addressed
  • Baseline method is described as 'project' in the monitoring report but 'jurisdictional' in the validation report, creating ambiguity about the baseline approach

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

0% deduction, justification contradicted across docs

Baseline

Method contradiction; grid EF from 2011

Safeguards

Mentioned and benefit-sharing described, but FPIC and grieva

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents