Heilongjiang Dajiazishan 49.5MW Wind Power Project
#861of 1935 in Renewable energy#450of 1084 in China#615of 1459 in CDM (UNFCCC)#675of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project in Heilongjiang, China, registered under CDM with a jurisdictional grid-emission-factor baseline and a 7-year crediting period (2015–2022). The project shows no material findings and a reasonable leakage treatment, but the extracted record lacks explicit confirmation of the additionality test and contains a significant discrepancy between the PDD's ex-ante estimate (616,763 tCO₂e) and the validation/monitoring reports (88,109 tCO₂e), which undermines confidence in the credit volume.
Red Flags
- Additionality test type and VVB confirmation are not stated in any extracted document, leaving a core CDM requirement unverified in the available record.
- The PDD (Aug 2019) reports a total ERR of 616,763 tCO₂e while the validation report (Sep 2019) and monitoring report (Aug 2019) both report 88,109 tCO₂e — a roughly 7-fold discrepancy that is not explained in the extracted data.
- If 88,109 tCO₂e covers only the ~3.7 years elapsed by the monitoring report date, the project delivered roughly 27 % of the pro-rata expectation implied by the PDD's full-period estimate, suggesting either a major output shortfall or a mislabelled figure.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 72,346 | 0 | 72,346 | |
| 2011 | 97,574 | 0 | 97,574 | |
| 2012 | 244,701 | 0 | 244,701 | |
| Total | 414,621 | 0 | 414,621 |
Risk Indicators
Test not confirmed in extracted record
Avoidance project, no reversal risk
0 % deduction, justified as negligible
Jurisdictional grid EF, reassessed 2019
Safeguards mentioned, FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →