Heilongjiang Dongning Dajiazishan and Xidagang Wind Farm Project
#1528of 1935 in Renewable energy#970of 1084 in China#1312of 1459 in CDM (UNFCCC)#1165of 1287 in ACM0002
Audit Analysis
A CDM wind farm project with a jurisdictional baseline and VVB-confirmed additionality, but severely limited documentation and a major unresolved discrepancy between the PDD and validation report on lifetime emissions reductions (864,304 vs 123,472 tCO2e). No monitoring data, verified ERR, or buffer pool information is available, and the extraction confidence is low, leaving significant evidence gaps across all dimensions.
Red Flags
- Massive ERR contradiction: the PDD reports 864,304 tCO2e while the validation report (same date, 2012-04-10) reports only 123,472 tCO2e — a 7-fold discrepancy with no explanation in the extracted record
- No monitoring report or verified ERR found in any available document; the project's actual performance is entirely unverified
- Grid emission factor is from 2007 (1.0838 tCO2/MWh) with no evidence of update or reassessment over the 7-year crediting period
- One of the six source documents is listed as 'unknown' and the minimum extraction confidence is rated low, undermining reliability of all extracted facts
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
mixed evidence / unresolved risk
0% deemed negligible, consistent with wind
Jurisdictional, 2007 grid EF, no reassessment data
Mentioned but no FPIC or grievance detail
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →