Heilongjiang Fujin Phase II 18MW Wind Power Project
#264of 1935 in Renewable energy#98of 1084 in China#166of 1459 in CDM (UNFCCC)#194of 1287 in ACM0002
Audit Analysis
A straightforward 18 MW onshore wind project in Heilongjiang, China, registered under CDM with a well-established methodology (ACM0002 v13). Additionality is VVB-confirmed via a combined test and the baseline uses a standard grid emission factor, but the project suffers from inconsistent leakage treatment across documents, missing verified emission figures, and absent safeguards documentation (FPIC, grievance mechanism). Four administrative corrective actions were raised, and no verification report appears in the evidence set.
Red Flags
- Leakage treatment is inconsistent: the validation report (2012) deems leakage negligible, but the monitoring report (2022) does not address leakage at all, leaving the 0% deduction without a clear, current justification.
- Verified emission reduction figures are not stated in any available document; only the claimed total of 252,570 tCO2e (monitoring report) is available, preventing independent cross-checking.
- Four corrective actions were required by the VVB, including correction of the baseline emission factor and an interest-rate calculation error in the IRR, indicating quality-control gaps in the original submission.
- Free, Prior and Informed Consent (FPIC) and a grievance mechanism are not documented in any available record, despite safeguards being mentioned in general terms.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test; IRR below benchmark
Avoidance project; no reversal risk inherent to wind
0% deduction; justification inconsistent across documents
Grid EF from 2011; method label inconsistent between reports
Mentioned in general; FPIC and grievance mechanism not docum
CORSIA and CCP status not stated in any document
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →