Skip to main content
CDMWindChinaACM0002

Heilongjiang Heihe Xiaoheishan Wind Power Project

CDM-6368 ↗

#620of 1935 in Renewable energy#300of 1084 in China#428of 1459 in CDM (UNFCCC)#478of 1287 in ACM0002

5.6/ 10
Integrity
6.5
Transparency
4.5
Claim Safety
5.5
Documentation
5.5

Audit Analysis

A CDM wind power project in China validated by DNV with a jurisdictional baseline and investment-test additionality, showing no material findings. However, the extracted record lacks monitoring-period data, verified emissions reductions, and safeguards detail, and a seven-fold discrepancy in claimed ERR between the PDD and validation report (likely annual vs. lifetime) reduces confidence in the data trail.

Red Flags

  • Total ERR differs by a factor of ~7 between the PDD (706,377 tCO₂e) and the validation report (100,911 tCO₂e); although this likely reflects a 7-year crediting-period total vs. an annual figure, the inconsistency is not explicitly reconciled in the documents.
  • No monitoring-period data or verified ERR figures were found in the extracted record, leaving the project's actual delivery unconfirmed.
  • Safeguards are mentioned but no FPIC, grievance mechanism, or benefit-sharing detail is documented in the available files.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Investment test confirmed by DNV

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, 'deemed negligible' only

Baseline

Jurisdictional, 2010 grid EF 0.9636

Safeguards

Mentioned but no FPIC or grievance detail

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents