Heilongjiang Huanan Changshoushan 49.5 MW Wind Power Project

CDM-7129 ↗

#693of 1935 in Renewable energy#340of 1084 in China#481of 1459 in CDM (UNFCCC)#535of 1287 in ACM0002

5.5/ 10
Integrity
7.0
Transparency
3.5
Claim Safety
6.5
Documentation
3.5

Audit Analysis

A 49.5 MW onshore wind project under CDM with a jurisdictional baseline and VVB-confirmed additionality (combined test by SGS), presenting a fundamentally sound design. However, the available record is limited to the PDD and validation report, with no monitoring or verification reports extracted, and the extraction confidence is flagged as low, significantly limiting the ability to confirm actual performance against the 700,616 tCO₂e lifetime claim.

Red Flags

  • No monitoring or verification reports were found in the extracted record; the 700,616 tCO₂e lifetime ERR claim cannot be cross-checked against verified figures
  • Seven Corrective Action Requests were raised during validation (including a metering-system inconsistency and a common-practice analysis gap), all closed but indicating initial documentation weaknesses
  • Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and some facts may be missing from the record

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

0 % deemed negligible, consistent with wind

Baseline

Jurisdictional grid-average baseline

Safeguards

Safeguards and benefit-sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents