Heilongjiang Huanan Hengdaishan East (II) Wind Power Project
#1432of 1935 in Renewable energy#885of 1084 in China#1176of 1459 in CDM (UNFCCC)#1099of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China validated by DNV with a jurisdictional grid-emission-factor baseline and VVB-confirmed investment additionality. However, the available record is limited to the validation stage: no monitoring reports, no verified emissions reductions, and seven material findings from the VVB raise questions about the robustness of the underlying analysis. A large discrepancy between the PDD's claimed 299,418 tCO₂e and the VVB-approved 42,774 tCO₂e signals significant initial over-claiming, though the VVB's reduction is protective.
Red Flags
- The PDD claimed 299,418 tCO₂e over the crediting period while the VVB validation report approved only 42,774 tCO₂e — an 86% reduction that indicates the project proponent's initial estimate was not well-supported.
- Seven material findings from DNV required clarification on additionality alternatives, investment parameters, sensitivity analysis, common-practice data, and monitoring frequency, suggesting the validation was not a straightforward confirmation.
- No monitoring reports or verified emissions reductions are present in the extracted record, so actual delivery against the approved 42,774 tCO₂e cannot be assessed.
- Corrective actions were required, including a name inconsistency between the PDD and the Letter of Approval and a revision of the PDD based on expert opinions.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
Negligible, no plausible pathway
Jurisdictional grid EF (2009)
Mentioned but no FPIC or grievance detail
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →