Heilongjiang Hulin Shiqingshan 1st Phase Wind Farm Project
#265of 1935 in Renewable energy#99of 1084 in China#167of 1459 in CDM (UNFCCC)#195of 1287 in ACM0002
Audit Analysis
A CDM wind farm project in China with a VVB-confirmed investment additionality test and a standard grid-emission-factor baseline. The project is low-risk in nature (avoidance of grid electricity), but several documentation inconsistencies—particularly around the leakage justification, baseline method labeling, and the relationship between the PDD and validation-report ERR figures—reduce confidence in the data record. No material compliance failures were found, and all five minor findings were resolved without corrective actions.
Red Flags
- Leakage justification is inconsistent: the validation report (2011) states leakage was 'deemed negligible' while the monitoring report (2012) states it was 'quantified'—the basis for the 0% deduction is unclear
- Total ERR figures differ by a factor of ~7 between the PDD (721,490 tCO₂e) and the validation report (103,070 tCO₂e); while this likely reflects a lifetime vs. first-year distinction, the documents do not explicitly reconcile the two
- Baseline method is labeled 'project' in the monitoring report but 'jurisdictional' in the PDD, creating ambiguity about whether a project-specific or grid-level baseline was applied
- Crediting-period start date differs between the validation report (Oct 1, 2011) and the monitoring report (Aug 11, 2011), despite a material finding confirming the date was 'corrected to Oct 1st 2011'
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 82,481 | 0 | 82,481 | |
| Total | 82,481 | 0 | 82,481 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, inconsistent justification
Grid EF baseline, method label conflict
Mentioned, benefit sharing described, FPIC/grievance not sta
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →