Heilongjiang Jiamusi Jianshan Wind Farm Project
#1177of 1935 in Renewable energy#689of 1084 in China#903of 1459 in CDM (UNFCCC)#920of 1287 in ACM0002
Audit Analysis
A CDM wind farm project with a VVB-confirmed investment additionality test and a reasonable zero-leakage assumption, but the available record is thin: no monitoring data, no verified emission reductions, a missing host-country Letter of Approval, and two inter-document contradictions (ERR magnitude and baseline method) that, while partially explainable, reduce confidence in the data trail. The low extraction confidence across six documents further limits the depth of assurance.
Red Flags
- Corrective action required at validation: Letter of Approval from the Host Party was not yet provided, a mandatory CDM compliance element.
- Baseline method is stated as 'project' in the validation report but 'jurisdictional' in the PDD — an unresolved discrepancy that affects the credibility of the baseline calculation.
- No monitoring-period data, verified ERR, or FNRB figures are present in the extracted record, making it impossible to confirm actual delivery against the claimed 107,523 tCO₂e/yr.
- Low extraction confidence across the document set means at least one key document was poorly readable, weakening the evidentiary base.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deemed negligible, appropriate for wind
Project-specific; PDD says jurisdictional — unresolved
Mentioned but no FPIC or grievance mechanism documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →