Heilongjiang Mishan Linchang Liumao Wind Farm Project
#1433of 1935 in Renewable energy#886of 1084 in China#1177of 1459 in CDM (UNFCCC)#1100of 1287 in ACM0002
Audit Analysis
A CDM wind farm project in China with a jurisdictional baseline and a reasonable 0% leakage treatment, but the extracted record is thin: additionality testing is not explicitly documented, a corrective action was raised on the build-margin emission factor calculation, and no monitoring-period data is available. The low extraction confidence and absence of verification reports limit confidence in the overall assessment.
Red Flags
- Corrective Action Request (CAR 1) in the validation report flagged an inconsistency in the build-margin emission factor calculation relative to Tool v7.0, raising the possibility that the initial baseline was miscalculated before correction.
- Additionality test type and VVB confirmation are not stated in the extracted record; while CDM mandates additionality, the absence of explicit documentation in the available files is a gap.
- No monitoring-period data, verification reports, or FNRB values are present in the extracted record, leaving the project's actual performance unverified.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 371,581 | 0 | 371,581 | |
| 2022 | 364,902 | 0 | 364,902 | |
| Total | 736,483 | 0 | 736,483 |
Risk Indicators
Test type and VVB confirmation not stated in extracted recor
Wind avoidance project; no reversal risk or events reported
0% deduction deemed negligible; appropriate for grid-connect
Jurisdictional baseline, reassessed 2020; CAR on BM EF corre
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →