Heilongjiang Xingkaihu Fengmishan Wind Farm Project
#1498of 1935 in Renewable energy#940of 1084 in China#1256of 1459 in CDM (UNFCCC)#1144of 1287 in ACM0002
Audit Analysis
A CDM wind energy project in China with a jurisdictional baseline and a 7-year crediting period, validated by CCSC. The project carries a material finding regarding an inconsistency in the build margin emission factor calculation method, and several key data points (additionality test type, monitoring period, FNRB) are absent from the extracted record. Low extraction confidence and the absence of a monitoring report limit the depth of assessment.
Red Flags
- Material finding (CAR 1): build margin emission factor calculation method was inconsistent with Tool version 7.0, requiring corrective action — this directly affects baseline accuracy and the magnitude of claimed credits
- Additionality test type and VVB confirmation of additionality are not stated in the extracted record, leaving the additionality basis unverified in available documentation
- Minimum extraction confidence is rated low, and one of the four source documents is of unknown type, reducing reliability of the evidence base
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 381,750 | 0 | 381,750 | |
| 2022 | 368,677 | 0 | 368,677 | |
| Total | 750,427 | 0 | 750,427 |
Risk Indicators
Test type not stated in record; VVB validated but basis unco
Wind project — no biogenic reversal risk
0% deduction, deemed negligible — consistent with wind
Jurisdictional baseline, but build margin EF calculation fla
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →