Heilongjiang Yilan Fuqiang Wind Power Project
#778of 1935 in Renewable energy#390of 1084 in China#556of 1459 in CDM (UNFCCC)#607of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China validated by CCSC using a jurisdictional grid emission factor baseline. The project is fundamentally sound in design (wind displacing grid electricity, negligible leakage), but a significant discrepancy between the PDD's stated emissions reductions (787,598) and the VVB-validated figure (112,514) raises claim-safety concerns, and the additionality test methodology is not explicitly confirmed in the extracted record.
Red Flags
- PDD (2019-08-27) states total ERR of 787,598 while the validation report (2019-08-30) and monitoring report both state 112,514 — a roughly 7-fold discrepancy that is unexplained in the available documents
- Additionality test type and VVB confirmation of additionality are not stated in the extracted record, leaving the robustness of the additionality claim unverified
- Material finding CAR-1: inconsistency in the description of EGfacility,y with ACM0002 v19.0 in the monitoring plan, requiring PDD revision
- One of the four evidence documents is listed as 'unknown' type, reducing confidence in the documentation set
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 41,048 | 0 | 41,048 | |
| 2013 | 48,771 | 0 | 48,771 | |
| Total | 89,819 | 0 | 89,819 |
Risk Indicators
Test type not confirmed in record
Wind generation, no reversal risk
0% with negligible justification
Jurisdictional grid EF, 2019
Mentioned but details unconfirmed
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →