Heilongjiang Yilan Hezuolinchang Phase II Wind Power Project

CDM-6094 ↗

#966of 1935 in Renewable energy#521of 1084 in China#709of 1459 in CDM (UNFCCC)#760of 1287 in ACM0002

5.2/ 10
Integrity
6.8
Transparency
3.8
Claim Safety
5.2
Documentation
3.5

Audit Analysis

A CDM wind power project in China validated by DNV in 2012 with a standard investment-test additionality assessment and jurisdictional grid baseline. However, significant contradictions exist between the PDD and validation report on both the grid emission factor and total ERR, no monitoring or verification reports are available, and the extraction confidence is low, limiting confidence in the project's actual performance and data reliability.

Red Flags

  • Grid emission factor discrepancy of ~12.6% between the PDD (0.9636) and the validation appendix (1.0852), directly affecting credit calculations
  • Total ERR discrepancy of 43% between the PDD (378,000 tCO2e) and the validation report (540,000 tCO2e), raising data reliability concerns
  • No monitoring reports or verified ERR figures available for the entire 7-year crediting period (2012–2019)
  • Low extraction confidence across the document set, indicating at least one key document was poorly readable
  • Grid emission factor sourced from 2009 data, applied in a 2012 validation, potentially overstating displacement credits as China's grid was decarbonising

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% justified, no physical pathway

Baseline

Jurisdictional but EF contradiction and dated 2009 value

Safeguards

Mentioned and benefit sharing described, but no FPIC or grie

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents