Skip to main content
CDMWindChinaACM0002

Heilongjiang Yilan Hezuolinchang Wind Power Project

CDM-5382 ↗

#1120of 1935 in Renewable energy#633of 1084 in China#857of 1459 in CDM (UNFCCC)#875of 1287 in ACM0002

5.0/ 10
Integrity
6.5
Transparency
3.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A CDM wind power project in China with a VVB-verified investment additionality test and a jurisdictional grid-emission-factor baseline, but the available record is limited to the validation stage with no monitoring or verification data. A significant discrepancy between the PDD and validation report on total emissions reductions (403,263 vs 57,609 tCO₂e) undermines confidence in the claimed figures, and the low extraction confidence across seven documents further limits assurance.

Red Flags

  • Total ERR discrepancy: the PDD (Sep 2011) states 403,263 tCO₂e while the validation report (Oct 2011) states 57,609 tCO₂e — a roughly 7× difference that is not reconciled in the available record
  • No monitoring or verification reports found; actual performance against the claimed 57,609 tCO₂e/year cannot be confirmed
  • Fifteen corrective actions were required at validation, indicating the project documentation was substantially incomplete at the time of VVB review
  • No FPIC or grievance mechanism documented despite safeguards being mentioned

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversal risk

Leakage

0% deemed negligible, appropriate for wind

Baseline

Jurisdictional grid EF (1.028, 2007)

Safeguards

Mentioned but no FPIC or grievance mechanism

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents