Heilongjiang Yilan Hezuolinchang Wind Power Project
#1120of 1935 in Renewable energy#633of 1084 in China#857of 1459 in CDM (UNFCCC)#875of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with a VVB-verified investment additionality test and a jurisdictional grid-emission-factor baseline, but the available record is limited to the validation stage with no monitoring or verification data. A significant discrepancy between the PDD and validation report on total emissions reductions (403,263 vs 57,609 tCO₂e) undermines confidence in the claimed figures, and the low extraction confidence across seven documents further limits assurance.
Red Flags
- Total ERR discrepancy: the PDD (Sep 2011) states 403,263 tCO₂e while the validation report (Oct 2011) states 57,609 tCO₂e — a roughly 7× difference that is not reconciled in the available record
- No monitoring or verification reports found; actual performance against the claimed 57,609 tCO₂e/year cannot be confirmed
- Fifteen corrective actions were required at validation, indicating the project documentation was substantially incomplete at the time of VVB review
- No FPIC or grievance mechanism documented despite safeguards being mentioned
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deemed negligible, appropriate for wind
Jurisdictional grid EF (1.028, 2007)
Mentioned but no FPIC or grievance mechanism
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →