Heilongjiang Yilan Jiguanlazishan Wind Farm Project
#862of 1935 in Renewable energy#451of 1084 in China#616of 1459 in CDM (UNFCCC)#676of 1287 in ACM0002
Audit Analysis
A CDM wind farm project with a VVB-confirmed combined additionality test and a jurisdictional baseline, but the available record is limited to validation-stage documents with no monitoring or verification reports. A significant discrepancy between the PDD and validation report on total ER figures (734,797 vs 104,971 tCO₂e) and a corrective action flagging the use of a non-recent grid emission factor introduce moderate uncertainty. The project is past its crediting period (ended April 2019) with no post-validation data in the extracted record.
Red Flags
- ERR contradiction: the PDD states 734,797 tCO₂e while the validation report states 104,971 tCO₂e (both dated 2012-08-10); the 7× ratio suggests an annual-vs-lifetime mix-up but the inconsistency is unresolved in the record
- Corrective Action 2: the most recent grid emission factor available at the time of PDD GSC was not used in the baseline calculation, raising a baseline-validity concern
- No monitoring report, verification report, or post-validation data found in the extracted record despite the crediting period having ended in April 2019
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Wind avoidance – no reversal risk
0% deemed negligible – consistent with wind
Jurisdictional but CAR flags non-recent grid EF
Mentioned but FPIC and grievance mechanism not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →