Skip to main content
CDMWindChinaACM0002

Heilongjiang Yilan Jiguanlazishan Wind Farm Project

CDM-6007 ↗

#862of 1935 in Renewable energy#451of 1084 in China#616of 1459 in CDM (UNFCCC)#676of 1287 in ACM0002

5.3/ 10
Integrity
6.5
Transparency
4.0
Claim Safety
5.5
Documentation
4.5

Audit Analysis

A CDM wind farm project with a VVB-confirmed combined additionality test and a jurisdictional baseline, but the available record is limited to validation-stage documents with no monitoring or verification reports. A significant discrepancy between the PDD and validation report on total ER figures (734,797 vs 104,971 tCO₂e) and a corrective action flagging the use of a non-recent grid emission factor introduce moderate uncertainty. The project is past its crediting period (ended April 2019) with no post-validation data in the extracted record.

Red Flags

  • ERR contradiction: the PDD states 734,797 tCO₂e while the validation report states 104,971 tCO₂e (both dated 2012-08-10); the 7× ratio suggests an annual-vs-lifetime mix-up but the inconsistency is unresolved in the record
  • Corrective Action 2: the most recent grid emission factor available at the time of PDD GSC was not used in the baseline calculation, raising a baseline-validity concern
  • No monitoring report, verification report, or post-validation data found in the extracted record despite the crediting period having ended in April 2019

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Wind avoidance – no reversal risk

Leakage

0% deemed negligible – consistent with wind

Baseline

Jurisdictional but CAR flags non-recent grid EF

Safeguards

Mentioned but FPIC and grievance mechanism not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents