Heilongjiang Yilan Maanshan Wind Power Project
#801of 1935 in Renewable energy#417of 1084 in China#502of 1339 in Verra (VCS)#628of 1287 in ACM0002
Audit Analysis
A registered VCS wind power project with VVB-confirmed additionality and no material findings, but undermined by an outdated 2005 grid emission factor, a 0% leakage deduction with no substantive justification in the verification report, and multiple contradictions across documents (baseline method, crediting period, leakage rationale). The project delivered approximately 110% of the pro-rata ex-ante expectation for the elapsed monitoring period, which is reassuring, but the absence of a buffer pool, FPIC, and grievance mechanism leaves safeguards and permanence governance thin.
Red Flags
- Grid emission factor of 1.146 tCO2/MWh is from 2005 and was never updated or reassessed during the 10-year crediting period, risking an overstated baseline as China's grid decarbonised.
- Leakage deduction is 0% and the verification report (2022) records the justification as 'not addressed', while the monitoring report (2022) claims it was 'deemed negligible' — an unresolved inconsistency in a project type where displaced electricity could be consumed elsewhere.
- Baseline method is recorded as 'project' in the 2022 verification report but 'jurisdictional' in the 2008 monitoring report; the contradiction is unexplained and affects confidence in the baseline construction.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2007 | 1,568 | 1,568 | 0 | |
| 2008 | 103,917 | 103,917 | 0 | |
| 2009 | 10,422 | 0 | 10,422 | |
| Total | 115,907 | 105,485 | 10,422 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% deduction, justification inconsistent
2005 grid EF, method contradiction
No FPIC, no grievance mechanism
CORSIA-excluded, CCP status unknown
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →