VCSLivestock, enteric fermentation, and manure management; Waste handling and disposalChina Registry: RegisteredAMS-III.D

Henan CP Group Swine Farm Biogas Recovery and Utilization Project

VCS-4745 ↗

#150of 268 in Biogas#802of 1084 in China#918of 1339 in Verra (VCS)#50of 105 in AMS-III.D

4.7/ 10
Integrity
5.5
Transparency
3.8
Claim Safety
4.8
Documentation
4.0

Audit Analysis

The Henan CP Group swine-farm biogas project has a VVB-confirmed regulatory additionality test and no reported reversal events, but suffers from a project-specific modeled baseline, an unquantified buffer pool, and a contradiction between the validation and verification reports on whether leakage was addressed. Multiple key MRV parameters (FNRB, usage rates, grid emission factor, end-use tracking) are absent from the extracted record, and the low extraction confidence across 11 documents limits assurance. The ERR figures are internally consistent between the monitoring and verification reports, but a conflicting lifetime figure from an unidentified document introduces uncertainty.

Red Flags

  • Leakage treatment contradicts between the validation report (not addressed) and the verification report (quantified); the actual deduction percentage is not stated in either document
  • A second ERR figure of 193,928.92 tCO₂e appears in an unidentified, undated document, creating ambiguity about the lifetime ex-ante estimate and the pro-rata delivery ratio
  • Ten corrective actions were required by the VVB, including corrections to leakage calculations, VSLT option selection, and monitoring frequency, indicating the initial documentation was incomplete
  • Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and the full evidentiary picture may be incomplete

Credit Vintages

IssuedRetiredAvailable
2022
14,814014,814
2023
16,751016,751
Total31,565031,565

Risk Indicators

Additionality

VVB-confirmed regulatory test

Permanence

mixed evidence / unresolved risk

Leakage

Quantified per VVB, but deduction % unstated and contradicted in validation report

Baseline

Project-specific modeled baseline; reassessment not yet due

Safeguards

FPIC conducted, grievance mechanism present, benefit sharing described

Double-claim

CORSIA and CCP status both unstated; dual-channel risk unassessed

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02AMS-III.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents