Skip to main content
VCSLivestock, enteric fermentation, and manure management; Waste handling and disposalChina Registry: RegisteredAMS-III.F

Henan Lehuijia Composting Project

VCS-2879 ↗

#634of 1329 in Industrial#691of 1084 in China#790of 1339 in Verra (VCS)#24of 43 in AMS-III.F

4.9/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
4.5
Documentation
5.5

Audit Analysis

The Henan Lehuijia Composting Project is a registered VCS manure-management project with a confirmed investment-test additionality, but it carries a heavy burden of eight material findings, three corrective actions, a 0% leakage deduction with contradictory justifications, and no stated buffer pool. A public comment flagged overestimation of reductions due to a dry/wet-basis error, which was subsequently corrected, reducing the verified figure from 60,125 to 41,807 tCO₂e. The project is functional but exhibits meaningful integrity and claim-safety weaknesses that warrant caution.

Red Flags

  • Eight material findings in the verification report, including missing investment-analysis detail, missing AMS-III.F monitoring requirements, and unclear applicability of a key methodology condition
  • Public comment identified overestimation of emission reductions due to confusion between dry and wet basis of manure; a corrective action recalculated the figure downward from 60,125 to 41,807 tCO₂e
  • Leakage deduction of 0% with contradictory justifications across documents (verification report says 'not addressed'; monitoring report says 'deemed negligible')
  • FPIC status contradicted between the PDD (not conducted) and the verification report (conducted), both dated 2022-12-13

Credit Vintages

IssuedRetiredAvailable
2020
7,3237,3230
2021
34,78326,6318,152
2022
18,01913,7524,267
Total60,12547,70612,419

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, contradictory justification

Baseline

Project-specific, no reassessment record

Safeguards

FPIC contradicted, grievance present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02AMS-III.F and AMS-III.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents