Henan Mianchi Shangqu Wind Power Project
#149of 1935 in Renewable energy#48of 1084 in China#94of 1459 in CDM (UNFCCC)#108of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with a robust combined additionality test confirmed by TÜV Rheinland and an appropriate jurisdictional grid-emission-factor baseline. The project carries low inherent reversal risk as a wind avoidance activity, and the 0% leakage deduction is reasonable for this technology. However, the absence of any monitoring-period data or verified emission reductions in the extracted record limits the ability to confirm actual delivery against the claimed 535,941 tCO₂ over the 2014–2020 crediting period.
Red Flags
- No monitoring-period data or verified emission reductions found in any available document, preventing confirmation of actual delivery against the claimed 535,941 tCO₂ lifetime estimate
- Leakage treatment is inconsistent across documents: the validation report concludes leakage is negligible while an appendix references a quantified approach, creating ambiguity in the final determination
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversal risk
0% deduction, negligible for wind
Jurisdictional grid EF, conservative
Mentioned but not detailed
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →