A CDM wind power project in Henan, China, with a jurisdictional grid-emission-factor baseline and VVB-confirmed investment additionality. The project is fundamentally sound for a wind avoidance project, but the validation report recorded nine material findings (all resolved) and a major discrepancy between the PDD's claimed emissions reductions (644,273 tCO₂e) and the VVB-verified figure (92,039 tCO₂e) raises data-quality concerns. Monitoring data and several safeguards details are absent from the extracted record.
Red Flags
- The PDD originally claimed 644,273 tCO₂e in total emissions reductions, but the VVB (CCSC) verified only 92,039 tCO₂e — an 86% reduction from the proponent's claim. CAR 2 in the validation report confirms an inconsistency between PDD sections A4.4 and B6.4 was corrected, suggesting the PDD contained significant calculation errors.
- Nine material findings (CARs) were raised during validation, including missing Letters of Approval, incorrect tax calculations in the IRR spreadsheet, use of an outdated grid-emission-factor tool, and insufficiently detailed monitoring procedures. Although all were resolved, the volume indicates weak initial PDD quality.
- No monitoring reports or monitoring period data were found in the extracted record, leaving the actual performance over the 2012–2019 crediting period unverifiable from available documents.
- Extraction confidence is rated low, meaning at least one key document was poorly readable, reducing confidence in the completeness of the evidence base.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Wind avoidance – no reversal risk
Negligible – no physical pathway
Jurisdictional grid EF (0.9289, 2010)
Mentioned; no FPIC or grievance detail
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →