Henan Sanmenxia 25.5MW Wind Power Project
#864of 1935 in Renewable energy#454of 1084 in China#618of 1459 in CDM (UNFCCC)#678of 1287 in ACM0002
Audit Analysis
A 25.5 MW onshore wind project under CDM with a jurisdictional baseline and standard ACM0002 methodology. The project was validated by CTC with no material findings, but the extracted record lacks a specified additionality test type and a verified ERR figure to cross-check against the 266,413 tCO₂e claimed. Overall a conventional, low-risk renewable energy project with moderate documentation gaps.
Red Flags
- Additionality test type and VVB confirmation are not specified in the extracted record, leaving the core CDM additionality requirement unverified in available data
- Verified ERR figure is absent from the extracted documents, preventing an independent cross-check of the 266,413 tCO₂e lifetime claim
- No buffer pool or explicit permanence mechanism is documented, though inherent reversal risk for wind is low
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 20,022 | 0 | 20,022 | |
| 2011 | 117,670 | 0 | 117,670 | |
| 2023 | 94,156 | 0 | 94,156 | |
| Total | 231,848 | 0 | 231,848 |
Risk Indicators
Test type not specified in extracted data
Wind – inherently low reversal risk
0% deemed negligible – standard for grid wind
Jurisdictional, reassessed 2019
Mentioned; FPIC and grievance not specified
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →