Henan Sheqi Xiawaxiang Wind Farm Phase I Project
GS-442 ↗ · current registry ID: GS2587
#72of 1935 in Renewable energy#15of 1084 in China#23of 1801 in Gold Standard (GS)#47of 1287 in ACM0002
Audit Analysis
A Gold Standard wind farm project with solid additionality (combined test, VVB-confirmed) and a jurisdictional grid-emission-factor baseline reassessed in 2022. The project is significantly over-delivering relative to its pro-rata ex-ante expectation, eliminating over-crediting risk, though CORSIA/CCP eligibility is unstated and a 20% grid-EF discrepancy between the 2022 validation and verification reports warrants attention.
Red Flags
- Grid emission factor differs by ~20% between the validation report (0.715375, Nov 2022) and the verification report (0.8581, Oct 2022); the lower value was privileged but the discrepancy is unexplained in the extracted record.
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.
- The project had no credit issuance between 2017 and the 2022 verification cycle, raising a question about sustained project management (resolved via a closed clarification request).
- Ten contradictions were identified across documents, most explainable by different time periods, but the grid-EF and baseline-method discrepancies reduce confidence in data consistency.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2015 | 62,437 | 62,437 | 0 | |
| 2016 | 90,680 | 90,680 | 0 | |
| 2017 | 11,657 | 11,657 | 0 | |
| 2019 | 39,688 | 24,688 | 15,000 | |
| 2020 | 81,807 | 14,064 | 67,743 | |
| 2021 | 82,455 | 8,409 | 74,046 | |
| Total | 368,724 | 211,935 | 156,789 |
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversals
0% deduction, quantified but method not detailed
Jurisdictional grid EF, reassessed 2022
Grievance mechanism present, FPIC not conducted
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →