Henan Yuxi Yanshan Wind Power Project
#1262of 1935 in Renewable energy#756of 1084 in China#995of 1459 in CDM (UNFCCC)#981of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China with a jurisdictional baseline and no material findings, but the extracted record lacks explicit confirmation of the additionality test, buffer pool allocation, and any monitoring-period verification data. The project is a low-permanence-risk avoidance activity (grid electricity displacement), yet the absence of monitoring reports and several key transparency fields limits confidence in the 501,326 tCO₂e lifetime claim.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record, leaving the additionality assessment unverified in available documents
- No monitoring reports appear in the evidence set; the 501,326 tCO₂e figure is the lifetime ex-ante estimate with no verified monitoring-period data to confirm actual delivery
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test type not stated in extracted record
mixed evidence / unresolved risk
Deemed negligible, reasonable for wind
Jurisdictional, grid EF 0.7538 (2017)
Safeguards mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →