Skip to main content
CDMWindChinaACM0002

Henan Yuxi Yanshan Wind Power Project

CDM-6253 ↗

#1262of 1935 in Renewable energy#756of 1084 in China#995of 1459 in CDM (UNFCCC)#981of 1287 in ACM0002

4.8/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
5.5
Documentation
4.5

Audit Analysis

A CDM wind power project in China with a jurisdictional baseline and no material findings, but the extracted record lacks explicit confirmation of the additionality test, buffer pool allocation, and any monitoring-period verification data. The project is a low-permanence-risk avoidance activity (grid electricity displacement), yet the absence of monitoring reports and several key transparency fields limits confidence in the 501,326 tCO₂e lifetime claim.

Red Flags

  • Additionality test type and VVB confirmation are not stated in the extracted record, leaving the additionality assessment unverified in available documents
  • No monitoring reports appear in the evidence set; the 501,326 tCO₂e figure is the lifetime ex-ante estimate with no verified monitoring-period data to confirm actual delivery

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Test type not stated in extracted record

Permanence

mixed evidence / unresolved risk

Leakage

Deemed negligible, reasonable for wind

Baseline

Jurisdictional, grid EF 0.7538 (2017)

Safeguards

Safeguards mentioned but FPIC/grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents