Hexi Biogas Recovery and Utilization Project

VCS-4816 ↗

#34of 268 in Biogas#344of 1084 in China#398of 1339 in Verra (VCS)#12of 105 in AMS-III.D

5.5/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
6.0
Documentation
5.5

Audit Analysis

The Hexi Biogas project is a VCS-registered biogas recovery project in China using AMS methodologies, with VVB-confirmed additionality and no material findings. However, the project-specific modeled baseline, absence of a stated buffer pool, inconsistent leakage treatment across documents, and a significant under-delivery relative to the PDD's lifetime estimate (verified ERR is roughly 29% of the pro-rata expectation) raise moderate concerns about baseline robustness and permanence safeguards.

Red Flags

  • Verified ERR of 42,272 tCO₂e is only ~29% of the pro-rata expectation (~146,900 tCO₂e) derived from the PDD's lifetime estimate of 385,133 tCO₂e over the 7-year crediting period, suggesting the baseline may be overly optimistic or the project underperformed
  • Buffer pool percentage is not stated in any available document, leaving permanence risk unquantified for a biogas project where system failure could lead to reversal
  • Leakage treatment is inconsistent: the monitoring report (Jan 2026) deems leakage negligible with a 0% deduction, while the validation report (Sep 2024) indicates leakage was not addressed at all
  • Internal contradiction within the monitoring report itself: the baseline is described as both 'modeled' and 'measured' in the same document (dated 2026-01-08)

Credit Vintages

IssuedRetiredAvailable
2022
11,595011,595
2023
18,424018,424
2024
12,253012,253
Total42,272042,272

Risk Indicators

Additionality

VVB-confirmed regulatory surplus test

Permanence

reversal risk unquantified

Leakage

0% deduction; justification inconsistent across documents

Baseline

Project-specific, modeled; reassessment not yet due (10-yr rule)

Safeguards

FPIC conducted; grievance mechanism present; safeguards documented

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02AMS-III.D., AMS III.AV.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents