Heyuan Dengta Landfill Gas Power Generation Project
#44of 189 in Methane#455of 1084 in China#530of 1339 in Verra (VCS)#39of 159 in ACM0001
Audit Analysis
A landfill gas power generation project under the well-established ACM0001 methodology with VVB-confirmed additionality, but undermined by three inter-document contradictions (leakage treatment, legal capture requirement, crediting period), a material finding on the monitoring plan, and low extraction confidence across the document set. The project type is inherently low-risk for permanence, yet the absence of a stated buffer pool, monitoring period, and usage-rate data leaves meaningful evidence gaps.
Red Flags
- Contradiction between PDD and validation report on whether landfill gas capture is legally required (PDD: yes; validation report: no) — if capture is mandated, additionality is compromised
- Contradiction on leakage treatment: PDD (2023) states leakage was quantified, while the validation report (2024) records it as merely 'deemed negligible' with a 0% deduction
- Material finding in the validation report: the monitoring plan did not meet ACM0001 requirements (corrected, but indicates initial MRV weakness)
- Minimum extraction confidence rated 'low' across the document set, reducing reliability of all extracted figures
- Total ERR claimed and verified are identical (977,106 tCO₂e) with no stated monitoring period, making independent verification of the figure impossible to confirm
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but capture-legality contradiction
LFG combusted; no reversal risk
0% deduction; PDD–VR contradiction on treatment
Project-specific, modelled; no reassessment date
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →