Heze Tech-Bank Animal Waste Management Systems (AWMS) GHG Mitigation Project
#786of 1329 in Industrial#805of 1084 in China#919of 1339 in Verra (VCS)#47of 66 in ACM0010
Audit Analysis
The Heze AWMS project has VVB-confirmed additionality and quantified leakage treatment, but suffers from severe under-delivery (approximately 23% of the pro-rata ex-ante expectation over the 2.5-year monitoring period) driven by multiple farm closures and poor pork market conditions. The absence of a stated buffer pool, a project-specific modeled baseline, and 15 material findings with 3 corrective action requests raise meaningful integrity concerns. The project remains in verification-approval-requested status with unresolved contradictions across documents.
Red Flags
- Project delivered only ~23% of the pro-rata ex-ante expectation (67,630 tCO2e actual vs ~290,747 tCO2e expected for the elapsed period), with four of seven farms ceasing production
- Four contradictions across documents (additionality test type, ERR figures, ex-ante lifetime estimate, crediting period) indicate data reliability issues
- 15 material findings and 3 corrective action requests identified during verification, including monitoring deviations and calculation inconsistencies
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
reversal risk unmitigated
Quantified at 10,020 tCO2e over monitoring period
Project-specific, modeled; reassessment not yet due
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →