Highland Park Forest Carbon Offsets
#79of 345 in United States#39of 59 in City Forest Credits (CFC)
Audit Analysis
The Highland Park urban forest project demonstrates solid additionality (combined test, VVB-confirmed) and a jurisdictional baseline, with a 5% buffer pool and no reversal events over the first monitoring period. However, the complete absence of any leakage quantification or justification is a notable gap for a tree-planting project, and contradictory ERR figures across the validation and verification reports introduce data-reliability concerns. Overall, the project is reasonably structured but carries moderate risk from the leakage omission and documentation inconsistencies.
Red Flags
- Leakage deduction and justification are entirely absent from all extracted documents — a significant gap for an urban tree-planting project where displaced trees or shifted planting elsewhere could generate leakage
- Contradictory ERR figures: the validation report (2022-10-26) reports 160 tCO₂e while the verification report (2022-10-25) reports 1,604 tCO₂e for both claimed and verified values, creating ambiguity about the actual credit volume
- Crediting period start dates differ between documents: the verification report states 2019-06-01 to 2045-06-01, while the validation report states 2022-06-23 to 2048-06-23, both spanning 26 years but anchored to different dates
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 160 | 0 | 160 | |
| Total | 160 | 0 | 160 |
Risk Indicators
Combined test, VVB-confirmed
mixed evidence / unresolved risk
No deduction or justification stated
Jurisdictional, reassessment timing not stated
Mentioned but FPIC and grievance mechanism not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →