Skip to main content
CDMLandfill gasIsraelACM0001

Hiriya Landfill Project

CDM-0147 ↗

#119of 189 in Methane#4of 8 in Israel#1179of 1459 in CDM (UNFCCC)#108of 159 in ACM0001

4.5/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
4.5
Documentation
4.8

Audit Analysis

The Hiriya Landfill Project is a CDM landfill gas project using the well-established ACM0001 v11 methodology, verified by ERM CVS. However, the project carries significant documentation concerns: twelve material findings, seven corrective actions, contradictory leakage treatment between the validation and monitoring reports, and a project-specific modeled baseline without a buffer pool. The project delivered roughly 360% of the pro-rata expectation for the first monitoring period, suggesting a conservative baseline, but the overall evidence base is weakened by the volume of unresolved issues.

Red Flags

  • Twelve material findings and seven corrective actions identified in the monitoring report, including inconsistent waste composition parameters (wOM, wBM) not updated for the second crediting period and missing justification for baseline simplifications
  • Contradictory leakage treatment: the validation report (Oct 2011) deems leakage negligible, while the monitoring report (Jul 2012) records it as not addressed, with a 0% deduction in both cases
  • No buffer pool or permanence mechanism documented for the project, and no reversal events data available
  • Additionality test (combined) is present but VVB confirmation of the test outcome is not stated in the extracted record
  • No FPIC, grievance mechanism, or end-use tracking documented despite safeguards being mentioned

Credit Vintages

IssuedRetiredAvailable
2009
90,820090,820
2010
50,200050,200
2011
65,579065,579
2012
66,817066,817
2013
23,733023,733
Total297,1490297,149

Risk Indicators

Additionality

Combined test present but VVB confirmation not stated in ext

Permanence

no reversal data available

Leakage

0% deduction with contradictory justification across documen

Baseline

Project-specific modeled baseline; last reassessed 2011; sim

Safeguards

Safeguards mentioned but no FPIC or grievance mechanism docu

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0001

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents