Hoa Binh 1 Wind Power Project
GS-2751 ↗ · current registry ID: GS10794
#92of 1935 in Renewable energy#5of 80 in Vietnam#31of 1801 in Gold Standard (GS)#60of 1287 in ACM0002
Audit Analysis
The Hoa Binh 1 Wind Power Project is a Gold Standard wind project with VVB-confirmed additionality and a reasonable pro-rata delivery rate (~93% of expectation for the elapsed monitoring period). However, contradictions between the verification and monitoring reports on baseline method and leakage justification, combined with the absence of explicit CORSIA/CCP status, introduce moderate uncertainty. The project is fundamentally low-risk as a wind avoidance project with no reversal events, but documentation gaps and a project-specific baseline prevent a higher rating.
Red Flags
- Baseline method is contradictory: the verification report (May 2024) states a project-specific baseline while the monitoring report (April 2024) references a jurisdictional baseline — the less robust project-specific interpretation is privileged
- Leakage justification is inconsistent: the verification report describes it as 'quantified' while the monitoring report calls it 'deemed negligible,' yet both apply a 0% deduction
- CORSIA eligibility and CCP status are not stated in any available document, leaving double-claiming risk unconfirmed
- Grid emission factor is from 2018 and no updated value or reassessment date is provided
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 55,944 | 55,944 | 0 | |
| 2022 | 105,173 | 80,251 | 24,922 | |
| Total | 161,117 | 136,195 | 24,922 |
Risk Indicators
Combined test, VVB-confirmed
Wind avoidance, no reversals
0% with quantified justification
Project-specific, method contradictory
Grievance present, FPIC not stated
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →