Skip to main content
CDMHydroVietnamACM0002

Hoi Xuan Hydropower Plant, Vietnam

CDM-6735 ↗

#865of 1935 in Renewable energy#43of 80 in Vietnam#619of 1459 in CDM (UNFCCC)#679of 1287 in ACM0002

5.3/ 10
Integrity
6.5
Transparency
4.0
Claim Safety
6.0
Documentation
3.5

Audit Analysis

The Hoi Xuan Hydropower Plant is a standard CDM small-hydro project with a verified combined additionality test and a jurisdictional grid-emission-factor baseline, both appropriate for the sector. However, the available record contains no monitoring reports, no verified emission-reduction figures, and the extraction confidence is low, leaving the project's actual performance unverified. The project's crediting period expired in August 2020, and no post-validation data is present in the extracted documents.

Red Flags

  • No monitoring reports or verified emission-reduction figures are present in the extracted record; the 1,554,357 tCO₂e lifetime claim is unverified against actual performance.
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, reducing reliability of the extracted data.
  • No buffer pool or permanence mechanism is documented, though hydro infrastructure carries inherently low reversal risk.
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

low inherent risk for hydro

Leakage

0% deemed negligible, consistent with hydro

Baseline

Jurisdictional grid EF, standard for ACM0002

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents