Hongkou 200MW Hydropower Project in Fujian Province
#1463of 1935 in Renewable energy#911of 1084 in China#1212of 1459 in CDM (UNFCCC)#1119of 1287 in ACM0002
Audit Analysis
The Hongkou 200 MW hydropower project has a confirmed investment-test additionality and a jurisdictional grid baseline, but the available record is limited to a single 2011 validation report with no monitoring or verification data. Twelve material findings and a seven-fold discrepancy between the PDD and validation-report emission-reduction figures raise serious data-reliability concerns that cannot be resolved with the documents on file.
Red Flags
- The PDD claims 2,294,278 tCO₂e over the crediting period while the validation report (ERM-CVS) records only 327,754 tCO₂e — a roughly 7× discrepancy that is unexplained in the available documents.
- Twelve material findings were raised by the VVB, including incorrect 2009 baseline emission-factor data, missing financial-analysis inputs, and absent calibration/accuracy details in the monitoring plan.
- No monitoring reports, verification reports, or verified emission-reduction figures are present in the extracted record for a project whose crediting period ended in May 2018.
- Leakage is treated as negligible with a 0% deduction, yet an appendix document appears to describe a quantified leakage treatment, creating an internal inconsistency.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Investment test confirmed by VVB
Avoidance project, no reversal data
0% deduction, negligible claim inconsistent with appendix
Jurisdictional grid EF (2009)
Safeguards mentioned, FPIC and grievance not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →