Household Biogas Project in Uttarakhand, India
#173of 268 in Biogas#779of 975 in India#1000of 1339 in Verra (VCS)#47of 60 in AMS-I.E
Audit Analysis
This household biogas project in Uttarakhand, India, was verified by 4K Earth Science but the verification report (March 2026) surfaced over twenty material findings, including a 15.8% downward revision of the non-renewable biomass fraction (fNRB from 86% to 72.4%), a 13,196-credit overestimation in the prior period, and an initially inadequate additionality demonstration. The VVB caught and corrected these issues, and a 5% quantified leakage deduction is applied, but the project-specific baseline, absence of a stated buffer pool, and extensive data-quality problems (database duplicates, end-user mismatches, missing tools) leave meaningful residual risk. The project is not CORSIA-eligible, which limits dual-channel exposure, but CCP status is not stated in the available record.
Red Flags
- fNRB revised downward from 86.0% to 72.4% due to a data-source correction, triggering a 13,196-credit deduction from the current period — indicating the initial ex-ante estimate was materially overstated
- Additionality demonstration was found inadequate regarding regulatory surplus and SSC thresholds; Tools 21 and 32 were missing from the project document and monitoring report
- 968 households were extrapolated as non-functional for up to 3 days based on a sample of 5 out of 70 surveyed households, raising concerns about the representativeness of the survey
- Biogas stove database contained end-user mismatches and duplicate entries, undermining confidence in the underlying household-level data
- Contradictions between the 2023 and 2026 verification reports on safeguards, FPIC, grievance mechanism, and benefit-sharing suggest these elements were not consistently documented across verification cycles
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 5,038 | 5,038 | 0 | |
| 2021 | 56,715 | 34,343 | 22,372 | |
| 2022 | 19,194 | 440 | 18,754 | |
| Total | 80,947 | 39,821 | 41,126 |
Risk Indicators
VVB-confirmed but initially inadequate
mixed evidence / unresolved risk
5% quantified deduction applied
Project-specific; reassessment timing not stated
Present per 2026 report; contradicted by 2023 report
CORSIA excluded; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →