Household biogas project in Xinhua County, Loudi City, Hunan Province
#137of 268 in Biogas#760of 1084 in China#997of 1459 in CDM (UNFCCC)#41of 115 in AMS-I.C
Audit Analysis
A CDM household biogas project in Hunan Province with a solid combined additionality test verified by DNV, but limited by the absence of any monitoring reports, a thin 0% leakage justification, and a 10× discrepancy in the claimed ERR between the PDD and the validation report. The project is at validation stage only, with no post-implementation data available to confirm delivery.
Red Flags
- The PDD states a total ERR of 523,990 tCO₂e while the validation report (later, VVB-verified) states 52,399 tCO₂e — a 10× discrepancy that, even if a typographical error, signals a data-quality weakness in the project documentation.
- No buffer pool, reversal-risk analysis, or permanence safeguard is documented; for a 10-year crediting period (2011–2021) this leaves no explicit protection against credit reversal.
- Leakage is set at 0% on the basis of a 'deemed negligible' justification with no quantified analysis, and a second (unidentified) source appears to describe the leakage treatment as 'quantified' — an unresolved contradiction.
- No monitoring reports, monitoring period, or verified usage-rate data are present in the extracted record, so actual delivery cannot be assessed.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
mixed evidence / unresolved risk
0% deduction, thin justification
Project-specific, measured
Mentioned but not detailed
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →