Household biogas project in Xintian, Ningyuan, Jianghua and Lanshan counties of Yongzhou City, Hunan Province
#194of 268 in Biogas#944of 1084 in China#1260of 1459 in CDM (UNFCCC)#64of 115 in AMS-I.C
Audit Analysis
A CDM household biogas project in Hunan Province with VVB-confirmed additionality (combined test by DNV), but undermined by a 10× discrepancy in the validated emission reduction figure between the PDD and validation report, two corrective action requests at validation, a project-specific modeled baseline with no buffer pool, and a 0% leakage deduction whose justification is inconsistent across documents. The project lacks any post-validation monitoring data, and the low extraction confidence further limits assurance.
Red Flags
- 10× discrepancy in total emission reductions: the PDD (2011-03-31) states 527,381 tCO₂e while the validation report (2011-04-04) states 52,738 tCO₂e — a factor-of-ten difference that cannot be reconciled without the underlying calculation sheets
- Two Corrective Action Requests at validation: the project participant failed to demonstrate compliance with AMS-III.R requirement 4(b) on methane destruction and with AMS-I.C Paragraph 27 on baseline emissions
- Leakage justification is contradictory: the validation report states leakage is 'deemed negligible' while an appendix describes it as 'quantified', yet the deduction is 0% in both cases
- No monitoring reports or post-validation verification data found in the extracted record
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test, VVB-confirmed
mixed evidence / unresolved risk
0% deduction, contradictory justification
Project-specific, modeled, no reassessment data
Mentioned, benefit sharing described, FPIC/grievance not sta
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →