Household water purifier programme in Guinea
GS-4063 ↗ · current registry ID: GS12143
#385of 1329 in Industrial#611of 1801 in Gold Standard (GS)
Audit Analysis
A Gold Standard household water purifier project in Guinea with VVB-verified additionality and no reversal events, but undermined by a 100-fold discrepancy in the fuel non-renewable baseline (fNRB) value between the verification and monitoring reports, seven corrective actions (including an fNRB calculation non-compliance with CDM TOOL30), and a project-specific baseline. The project delivered roughly 64% of its pro-rata ex-ante expectation for the first full monitoring year, and several cross-document contradictions (leakage, benefit sharing, fNRB method) reduce confidence in the data chain.
Red Flags
- fNRB value differs by a factor of 100 between the verification report (48.305) and the monitoring report (0.48305), creating material uncertainty about the magnitude of claimed reductions
- fNRB method is stated as 'national default' in the verification report but 'local field' in the monitoring report, compounding the value discrepancy
- Seven corrective actions were required, including a material finding that the fNRB calculation did not comply with CDM TOOL30 requirements
- Leakage deduction is 5% in the verification report but 0% in the validation report, both dated 2025-02-28
- The project verified 55,000 tCO2e against a pro-rata ex-ante expectation of approximately 86,230 tCO2e for the one-year monitoring period (63.8% delivery)
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 55,000 | 0 | 55,000 | |
| Total | 55,000 | 0 | 55,000 |
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversals
5% deduction but contradicts validation (0%)
Project-specific, fNRB calculation issues
FPIC, grievance, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →