Huadian Fuqing Niutouwei Wind Power Project
#1266of 1935 in Renewable energy#763of 1084 in China#1000of 1459 in CDM (UNFCCC)#984of 1287 in ACM0002
Audit Analysis
A CDM wind power project in China validated in 2011 with a combined additionality test confirmed by the VVB and a jurisdictional grid baseline. The project design is sound for a wind displacement project, but the available record contains only validation-stage documents with no monitoring or verification data, leaving actual performance unconfirmed. Administrative material findings were raised at validation but none undermine the core methodology.
Red Flags
- No monitoring or verification reports found in the extracted record — actual emissions reductions over the 2011–2018 crediting period are unconfirmed
- Five material findings at validation, including missing Letters of Approval from both the Chinese and UK Designated National Authorities, and an inconsistency between meter descriptions and the connection diagram
- No buffer pool or permanence mechanism documented, and no reversal events data available to confirm the project operated without reversals
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
no reversal data
0% deemed negligible (wind)
Jurisdictional grid EF 0.8325
Mentioned; FPIC/grievance not stated
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →