Huadian Gansu Jiayuguan 10MWp Grid-connected Photovoltaic Power Project
#1037of 1935 in Renewable energy#576of 1084 in China#774of 1459 in CDM (UNFCCC)#331of 806 in AMS-I.D
Audit Analysis
A 10 MWp grid-connected solar PV project under CDM with a sound core design (jurisdictional baseline, VVB-confirmed investment additionality, reasonable zero-leakage claim), but significantly undermined by nine material findings at validation, a contradiction in the claimed emission reduction figure between the validation report and an appendix, and the absence of any monitoring or verification data in the available record. The project is a straightforward renewable-energy avoidance credit with low inherent reversal risk, yet the documentation gaps and data inconsistencies limit confidence in the final credit quantity.
Red Flags
- Nine material findings (CARs) at validation, including inconsistencies in installed capacity (10.032 MWp vs 10 MWp), incomplete EPC contract, and missing evidence for low-cost/must-run resource proportion in the NWCPG
- Contradiction in total claimed emission reductions: the validation report states 102,534 tCO₂ while an appendix lists 348,965 tCO₂ — a 3.4× discrepancy with no reconciliation
- No monitoring or verification report data is present in the extracted record; total verified ERR is not available
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Solar avoidance – no reversal risk
0% – negligible for grid-connected PV
Jurisdictional grid EF (0.918)
Mentioned but FPIC/grievance not detailed
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →