Huadian Gansu Yumen Heiyazi First Phase 48MW Wind Power Project

CDM-5127 ↗

#32of 1935 in Renewable energy#5of 1084 in China#22of 1459 in CDM (UNFCCC)#20of 1287 in ACM0002

7.0/ 10
Integrity
7.5
Transparency
6.5
Claim Safety
7.0
Documentation
7.0

Audit Analysis

A 48 MW onshore wind CDM project in Gansu, China, with a well-supported combined additionality test verified by DNV and a jurisdictional grid emission factor baseline. The project delivered approximately 85% of the pro-rata emission reduction expectation for the first monitoring period, and no material compliance issues or corrective actions were identified. Minor contradictions between the validation report and monitoring report on baseline characterisation and leakage justification warrant attention but do not undermine the overall integrity of the credit.

Red Flags

  • Baseline method is characterised as 'project' in the monitoring report but 'jurisdictional' in the validation report — the jurisdictional characterisation is more appropriate for wind power and should be confirmed as the operative basis.
  • Leakage justification is described as 'quantified' in the monitoring report but 'deemed negligible' in the validation report, creating ambiguity about whether a quantitative assessment was actually performed.
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.

Credit Vintages

IssuedRetiredAvailable
2013
83,883083,883
Total83,883083,883

Risk Indicators

Additionality

Combined test, VVB-verified

Permanence

Physical asset, no reversals

Leakage

0% deduction, justification inconsistent

Baseline

Jurisdictional EF, method contradiction

Safeguards

Mentioned, details sparse

Double-claim

CORSIA/CCP not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents