Huadian Guyuan Phase II 100.5MW Wind Farm Project
#1267of 1935 in Renewable energy#764of 1084 in China#1001of 1459 in CDM (UNFCCC)#985of 1287 in ACM0002
Audit Analysis
A 100.5 MW onshore wind farm in China validated under CDM methodology ACM0002 with a jurisdictional baseline and VVB-confirmed additionality. The project's core design is sound for a wind displacement project, but three material findings at validation—including a non-conservative energy calculation formula—and the complete absence of monitoring or verification data in the available record significantly limit confidence in the claimed 220,098 tCO₂e/yr (1,540,686 tCO₂e lifetime) emission reductions.
Red Flags
- The validation report identified a non-conservative calculation formula for EGfacility,y in PDD v1.1 (finding CL 01), requiring revision before credit issuance
- No monitoring reports or verification reports are present in the extracted record; total verified ERR is not available, making it impossible to confirm actual delivery against the claimed 220,098 tCO₂e/yr
- Low extraction confidence across the document set, indicating at least one key document was poorly readable or incomplete
- Three material findings and four corrective actions were raised at validation, including missing LoA from the UK DNA and missing Modalities of Communication documentation
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
Negligible, consistent with wind displacement
Jurisdictional grid EF (2011)
Mentioned but FPIC and grievance mechanism not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →