Huadian Haiyuan Wuyuan First Phase 49.5MW Wind Power Project
#564of 1935 in Renewable energy#266of 1084 in China#384of 1459 in CDM (UNFCCC)#434of 1287 in ACM0002
Audit Analysis
A 49.5 MW onshore wind project in China validated under CDM methodology ACM0002 with a jurisdictional baseline and VVB-confirmed combined additionality test. The project presents no material findings or corrective actions, but the available record contains only validation-stage documents with no monitoring reports, verified emission reductions, or buffer pool details, limiting the ability to confirm actual performance and permanence.
Red Flags
- No monitoring reports or verified emission reduction figures are present in the extracted record; actual performance over the 2012–2019 crediting period cannot be confirmed.
- The PDD (June 2012) reports a total expected reduction of 583,898 tCO₂e while the validation report (September 2012) reports 83,414 tCO₂e; although the 7× ratio matches the 7-year crediting period (suggesting an annual vs. lifetime reporting difference), the discrepancy is not explicitly reconciled in the documents.
- Buffer pool percentage and reversal-event history are not stated in any available document, leaving permanence safeguards unverified.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test confirmed by TÜV SÜD
mixed evidence / unresolved risk
0% deduction, deemed negligible (wind)
Jurisdictional, 2011 grid EF
Safeguards mentioned; FPIC and grievance not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →