Huadian Hebei Guyuan 100.5MW Wind Farm Project
#1268of 1935 in Renewable energy#765of 1084 in China#1002of 1459 in CDM (UNFCCC)#986of 1287 in ACM0002
Audit Analysis
A 100.5 MW onshore wind project under CDM with VVB-confirmed additionality and a standard grid-emission-factor baseline, but undermined by multiple material findings, a 2008 grid emission factor that has not been updated, and three contradictions between the validation and monitoring reports. The project is inherently low-risk in terms of permanence (avoidance-type), yet the documentation quality and data currency raise meaningful concerns about the robustness of the credit claims.
Red Flags
- Grid emission factor of 1.0342 tCO2/MWh is based on 2008 data and has not been updated, potentially overstating or understating credits relative to current grid conditions
- Seven corrective/clarification requests (CLs) and two corrective actions (CARs) were raised by the VVB, including errors in the additionality calculation steps and incomplete monitoring documentation
- Three contradictions between the validation report (Jan 2011) and monitoring report (Oct 2011) on leakage justification, baseline method, and ERR figures indicate inconsistent project documentation
- No verification report appears in the evidence document list; only a validation report and a single six-month monitoring report are available
- All available monitoring data is from 2011, making the project's current performance and continued eligibility unverifiable from the extracted record
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Avoidance project, no reversal risk
0% deduction, justification inconsistent across docs
Grid EF from 2008, not reassessed
Safeguards mentioned, FPIC and grievance not stated
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →