Huadian Inner Mongolia Guyang Hongnijing Phase II Wind Farm Project
#565of 1935 in Renewable energy#267of 1084 in China#385of 1459 in CDM (UNFCCC)#435of 1287 in ACM0002
Audit Analysis
A CDM wind farm project in Inner Mongolia with a VVB-confirmed combined additionality test and a jurisdictional grid-emission-factor baseline, both appropriate for the sector. However, the available record contains only the validation report and PDD — no verification or monitoring reports were found — and a significant discrepancy exists between the PDD's lifetime ERR estimate (641,949 tCO₂e) and the validation report's crediting-period figure (91,707 tCO₂e). Safeguards documentation (FPIC, grievance mechanism) is absent from the extracted record, and several material findings at validation required clarification.
Red Flags
- No verification or monitoring report data found in the extracted record; total ERR verified is not stated, making it impossible to confirm actual delivery against the pro-rata expectation
- ERR discrepancy of ~7× between the PDD (641,949 tCO₂e) and the validation report (91,707 tCO₂e) — the PDD figure likely spans a longer horizon, but the basis is not explicitly reconciled in the available documents
- One outstanding corrective action at validation (Letters of Approval from China and Sweden) with no evidence of closure in the available documents
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Combined test confirmed by DNV
mixed evidence / unresolved risk
0% deduction, reasonable for grid-displacement wind
Jurisdictional grid EF (0.8959, 2011), standard for ACM0002
Safeguards mentioned but no FPIC or grievance mechanism documented
CORSIA and CCP statuses not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →