Huadian Inner Mongolia Naiman Banner First Phase 49.5MW Wind Power Project

CDM-6074 ↗

#701of 1935 in Renewable energy#349of 1084 in China#489of 1459 in CDM (UNFCCC)#542of 1287 in ACM0002

5.5/ 10
Integrity
7.0
Transparency
3.5
Claim Safety
6.5
Documentation
4.0

Audit Analysis

A 49.5 MW onshore wind project in Inner Mongolia validated under CDM methodology ACM0002 with a VVB-confirmed combined additionality test and a jurisdictional baseline. The project design is sound for a renewable energy credit, but the available record contains no monitoring or verification data, and the low extraction confidence limits assurance on the completeness of the documentation set.

Red Flags

  • No monitoring reports or verified ERR figures are present in the extracted record, making it impossible to cross-check the 824,600 tCO2e claimed against actual generation.
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable and the full evidentiary picture may be incomplete.
  • Eight material findings (four CLs, four CARs) were raised during validation, including missing Letters of Approval and unclear metering arrangements, although all were subsequently resolved.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Renewable energy – no reversal risk

Leakage

Deemed negligible, 0% deduction

Baseline

Jurisdictional grid-average EF

Safeguards

Mentioned but FPIC and grievance mechanism not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents