Huadian Kailu Yihetala Phase one 49.5 MW Wind Farm Project
#782of 1935 in Renewable energy#397of 1084 in China#562of 1459 in CDM (UNFCCC)#612of 1287 in ACM0002
Audit Analysis
A 49.5 MW CDM wind farm in China with VVB-confirmed additionality (combined test by DNV) and a reasonable 0% leakage deduction for grid-displacement technology. However, 21 material findings at validation revealed significant initial calculation and documentation errors, and four cross-document contradictions (baseline method, ERR figures, leakage justification, crediting period) create residual uncertainty about the robustness of the credit claims.
Red Flags
- 21 material findings at validation including incorrect emission factor calculations, inadequate IRR sensitivity analysis, and missing spatial boundaries — all corrected but indicating a weak initial additionality case
- Baseline method contradicts between the PDD (jurisdictional) and the 2012 monitoring report (project-specific), creating ambiguity about the actual baseline approach
- Total ERR claimed differs by a factor of ~2.2 between the 2010 monitoring report (65,495 tCO2e) and the 2012 monitoring report (146,274 tCO2e), with no VVB-verified figure available in the extracted record
- Leakage justification is inconsistent: the validation report (2009) states 'deemed negligible' while the monitoring report (2012) states 'quantified', despite both documents reporting a 0% deduction
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 65,495 | 0 | 65,495 | |
| Total | 65,495 | 0 | 65,495 |
Risk Indicators
VVB-confirmed but 21 initial deficiencies corrected
Avoidance technology, no reversal events reported
0% deduction reasonable but justification inconsistent across docs
Jurisdictional per PDD but contradicted by monitoring report
Safeguards mentioned but FPIC and grievance mechanism not documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →