Huadian Ningxia Haiyuan Danangou 49.5MW Wind Power Project

CDM-7085 ↗

#705of 1935 in Renewable energy#353of 1084 in China#493of 1459 in CDM (UNFCCC)#546of 1287 in ACM0002

5.5/ 10
Integrity
6.5
Transparency
4.0
Claim Safety
5.5
Documentation
5.5

Audit Analysis

A 49.5 MW onshore wind project in Ningxia, China, validated under CDM methodology ACM0002 with a combined additionality test confirmed by DNV. The jurisdictional grid-emission-factor baseline is appropriate for wind, and the project carries no inherent reversal risk. However, no verified monitoring data is available in the extracted record, and several MRV and safeguards details remain unstated, limiting confidence in the claimed 569,926 tCO₂e.

Red Flags

  • No verified emissions reduction data (total ERR verified) is present in the extracted record, so the claimed 569,926 tCO₂e cannot be independently confirmed.
  • Contradiction between the validation report (leakage 'deemed negligible') and an appendix (leakage 'quantified') creates ambiguity about whether leakage was actually calculated.
  • FPIC, grievance mechanism, and stakeholder consultation details are not documented in the available record, despite a clarification request on stakeholder consultation in the validation report.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test, VVB-confirmed (DNV)

Permanence

Avoidance technology, no reversal risk

Leakage

0% deemed negligible; minor doc contradiction

Baseline

Jurisdictional grid EF, standard for wind

Safeguards

Mentioned but FPIC/grievance not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents